We had a group meeting after EID103 class session to discuss individual sketches and decide group's best idea sketches.
Found several strengths and weaknesses of our individual drawings.
So, we brainstormed ideas about our design and made certain improvements such as better slide-open rid that also lifts up allograft parts and fool-proof mechanism that doesn't let the rid open too quickly.
We worked on finishing group sketches and ended up drawing three more new sketches.
Meeting with Daniel Gitzel
Daniel designed and programmed a pump system using a diaghragm pump (better for removing liquid), peristaltic pump, and arduino control system.
He gave us all documents from last year's project.
He showed us where all the necessary parts were stored.
He briefly explained how the system work.
However, the pump that he used is not available right now, therefore we will have to use different pump.
The control system needs to be modified for a new pump.
General Meeting
Progress and objects were discussed - we need to re-build the pump system.
We made a first draft of problem statement.
We discussed about the time line (Tentative schedule)
General Meeting
Progress and goals were discussed
We need to verify that impulse sealer works with the thick IV bag.
Find another peristaltic pump available
Find a large container to store a knee
Design a system that uses IV bag instead of sterile container.
Work on making an IV bag with input and output valves.
After few trials, we figured out a method to successfully sealing IV bag: Set impulse sealer dial at 8 and quickly press down firmly three times)
We discussed how the tubing system will be.
Successfully operated the pump system comprised of a peristaltic pump, a diaphragm pump, and four chambers with manually caliberated pump rates.
We decided to use Tupperware for solid chamber.
We made a first design of IV bag with input and output valves.
We used an IV bag with 2 tubes.
Attached valves that enables us to control flow directly.
Met with Prof. Lima and talked about purchasing media bags and containers.
Discussed about which tubing size is ideal for the project.
We decided to finalize our BOM soon.