Back to allograft preservation page
We were able to re-build and successfully operate the pump system.
We calibrated pump rates manually due to problems with arduino chip. Therefore solenoid valves that control liquid flow into each chambers were not functional at this time
However, we fixed the problem and decided to improve arduino control system
Next run of the pump system will be fully functional.