This shows you the differences between two versions of the page.
|
labinfo:people:students2011:ghost_protocol:ghost_protocol_minutes [2012/02/22 11:36] ytokayer |
labinfo:people:students2011:ghost_protocol:ghost_protocol_minutes [2012/02/22 11:55] (current) ytokayer |
||
|---|---|---|---|
| Line 39: | Line 39: | ||
| ===== 2/22/2012 ===== | ===== 2/22/2012 ===== | ||
| The goal of this meeting was to come up with the "switching" mechanism for the automata, a prototype of which is due on Friday. WOOHOO! | The goal of this meeting was to come up with the "switching" mechanism for the automata, a prototype of which is due on Friday. WOOHOO! | ||
| + | |||
| + | Proposal 1: | ||
| + | A double geneva mechanism, and we use slow steps to drive the motion of each side. | ||
| + | |||
| + | Proposal 2: | ||
| + | A shaved driving gear, so that half the time it is engaged with one side, and disengaged for the other half. | ||
| + | |||
| + | For Friday, we will prototype Propoal 2. Neil and Yaron will work on the drawing and solidworks, whilst Janet and Jon (from the laser cutting group) build. | ||
| + | |||
| + | Break! | ||