Group Minutes

Please post these here:

October 20, 2010

November 3, 2010

  • Presented basic concept of ventilation system
  • Need to work on these details
  • Method to connect existing ventilation port
  • Size of the honeycomb ( preferably greater than table dimensions)
  • Rulers on the sides of ventilation box
  • Method to fasten the box to the stage
  • Ease of access to clean or replace the honeycomb panel
  • Protection of the exhaust blower from debris (screen)
  • Material for the box (preferably light weight)

November 10, 2010

  • Design process of honeycomb table started
  • Gathering of information about possible construction materials
  • Changes on honeycomb table dimensions
  • Meeting and consulting machine shop technicians
  • Concerns about using CNC machine ventilation system
  • Adjustments on flexibility of securing materials while cutting
  • Considerations regarding movement of thin materials: paper, card board, textile, etc.

November 16, 2010

  • Presentation of ventilation box design
  • Needs to work on dimensions to maximize laser's working area
  • Research on prices for materials in MacMaster
  • Design of possible tests for ventilation system

November 24, 2010

  • Ventilation system approved
  • Final adjustments to the honeycomb table
  • Continue working on selecting building materials
  • Start working on final report and final design files

November 30, 2010

  • Order of materials submitted
  • Waiting for materials to arrive: aluminum honeycomb sheet
  • Final Report Submitted
  • Considering building cardboard model
 
start/projects/ventilation_group.txt · Last modified: 2011/01/25 14:22 by ballcalvin
 