This shows you the differences between two versions of the page.
labinfo:people:students2011:team_symbl:april_minutes [2012/04/21 15:21] dmoreno |
labinfo:people:students2011:team_symbl:april_minutes [2012/04/27 00:24] (current) dmoreno |
||
---|---|---|---|
Line 13: | Line 13: | ||
* Metal shafts were cut into their proper lengths for integration into the music box. | * Metal shafts were cut into their proper lengths for integration into the music box. | ||
* Met to discuss final plans and schedule for assembling the entire box. | * Met to discuss final plans and schedule for assembling the entire box. | ||
+ | |||
+ | **April 23, 2012** | ||
+ | * Began intensive work for the final project; assembled the entire wooden box, shafts, some gears, and added "grass" to the scenery. | ||
+ | |||
+ | **April 24, 2012** | ||
+ | * Converted some parts of the Foundation Building in SolidWorks to AutoCAD and laser-cut them (on plywood of course). | ||
+ | |||
+ | **April 25, 2012** | ||
+ | * Laser-cut the front design of the Foundation Building and redid the cam on 1/8" acrylic as opposed to 1/4". | ||
+ | |||
+ | **April 26, 2012** | ||
+ | * Worked on the aesthetics of the Foundation Building. | ||
+ | * Currently trying to figure out how to adjust parts which do not line up with what was expected on the music box, since the music box had a slight offset causing problems with getting all of our parts to work together. | ||
+ | * Deadline got extended to May 4th!!! | ||
+ | |||