This is an old revision of the document!


Schedule


The date indicates when the tasks should be completed by. The symbols mean the following:

⊗ Not complete

— Significant work has been done on this task

✔ Complete


March 10, 2011

✔ The physical load cell connection must be made

✔ A sequence of commands must be made through programming in order to do initial testing

✔ The design of the control tower must be made with specific measurements

- Control tower must be built

- Initial accuracy data must be collected from multiple tests in the CNC machine

✔ Data should be compiled in excel or matlab for analyzation

 
classes/principlesofdesign/cncmechanicaltester/schedule.1300761145.txt.gz · Last modified: 2011/03/21 22:32 by nmuir
 
Except where otherwise noted, content on this wiki is licensed under the following license:CC Attribution-Noncommercial-Share Alike 3.0 Unported
Recent changes RSS feed Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki