Schedule


The date indicates when the tasks should be completed by. The symbols mean the following:

⊗ Not complete

— Significant work has been done on this task

✔ Complete


March 10, 2011

✔ The physical load cell connection must be made

✔ A sequence of commands must be made through programming in order to do initial testing

✔ The design of the control tower must be made with specific measurements

- Control tower must be built

- Initial accuracy data must be collected from multiple tests in the CNC machine

✔ Data should be compiled in excel or matlab for analyzation

May 4, 2011

There are no scheduled meetings as of now, please refer to the minutes page to see what work has been done.

 
classes/principlesofdesign/cncmechanicaltester/schedule.txt · Last modified: 2011/05/04 15:52 by nmuir
 
Except where otherwise noted, content on this wiki is licensed under the following license:CC Attribution-Noncommercial-Share Alike 3.0 Unported
Recent changes RSS feed Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki