==Group Minutes== Please post these here: ===October 20, 2010=== * Presented on [[Ventilation System|ventilation system]]. * Need to work out honeycomb, [[Surface Ventilation|surface ventilation]]. ===November 3, 2010=== * Presented basic concept of ventilation system * Need to work on these details * Method to connect existing ventilation port * Size of the honeycomb ( preferably greater than table dimensions) * Rulers on the sides of ventilation box * Method to fasten the box to the stage * Ease of access to clean or replace the honeycomb panel * Protection of the exhaust blower from debris (screen) * Material for the box (preferably light weight) ===November 10, 2010=== * Design process of honeycomb table started * Gathering of information about possible construction materials * Changes on honeycomb table dimensions * Meeting and consulting machine shop technicians * Concerns about using CNC machine ventilation system * Adjustments on flexibility of securing materials while cutting * Considerations regarding movement of thin materials: paper, card board, textile, etc. ===November 16, 2010=== * Presentation of ventilation box design * Needs to work on dimensions to maximize laser's working area * Research on prices for materials in MacMaster * Design of possible tests for ventilation system ===November 24, 2010=== * Ventilation system approved * Final adjustments to the honeycomb table * Continue working on selecting building materials * Start working on final report and final design files ===November 30, 2010=== * Order of materials submitted * Waiting for materials to arrive: aluminum honeycomb sheet * Final Report Submitted * Considering building cardboard model