====== Minute - March ====== [[start:classes:principlesofdesign:allograftpreservation_2012:start|Back to allograft preservation page]] ===== 03/02/2012 ===== * We confirmed the list of necessary parts with Prof. Lima * Since we are using the new pump, we need to find a different way to operate the pump automatically. * We used 24V relay to mechanically connect pin 8 and pin 14 of the Masterflex peristaltic pump. * **Link : **[[Alduino control system turning on the pump|Arduino relay test]] ===== 03/07/2012 ===== * All group members met to work on the midterm presentation. * We decided to minimize text and make a good use of visual aids (flow charts) * We divided the presentation into three parts (Overview/Problem - Materials - Control System) * Rehearsal * **Link : ** [[Midterm Presentation (PPT)|Midterm PowerPoint presentation]]. ===== 03/19/2012 ===== * We worked on the House of Quality for Automatic Lift Bed. * We decided to focus on performance (safety) and aesthetic elements. * **Link : ** [[House of Quality for Automatic Lift Bed (PDF)|House of Quality]]. ===== 03/24/2012 ===== * Since the price of IV bag and other parts could be minimized, we researched for cheaper IV bag / sterile media bags. * - Waiting for our order to arrive... - ===== 03/26/2012 ===== * We designed an automatic lift bed that operates with rack and pinion mechanism. * We included a drop out table. * We also added a book shelf that functions as storage and support for the bed system. * We were able to get rid of 4th post * - Still waiting for our orders... - * **Link : ** [[Automatic Lift Bed Design]]