====== Schedule ====== ---- **The date indicates when the tasks should be completed by. The symbols mean the following: ** ⊗ Not complete — Significant work has been done on this task ✔ Complete ---- ====== March 10, 2011 ====== ✔ The physical load cell connection must be made ✔ A sequence of commands must be made through programming in order to do initial testing ✔ The design of the control tower must be made with specific measurements - Control tower must be built - Initial accuracy data must be collected from multiple tests in the CNC machine ✔ Data should be compiled in excel or matlab for analyzation ====== May 4, 2011 ====== There are no scheduled meetings as of now, please refer to the [[classes:principlesofdesign:cncmechanicaltester:minutes|minutes]] page to see what work has been done.