| + | ==Group Minutes== | ||
| + | Please post these here: | ||
| + | ===October 20, 2010=== | ||
| + | * Presented on [[Ventilation System|ventilation system]]. | ||
| + | * Need to work out honeycomb, [[Surface Ventilation|surface ventilation]]. | ||
| + | |||
| + | ===November 3, 2010=== | ||
| + | * Presented basic concept of ventilation system | ||
| + | * Need to work on these details | ||
| + | * Method to connect existing ventilation port | ||
| + | * Size of the honeycomb ( preferably greater than table dimensions) | ||
| + | * Rulers on the sides of ventilation box | ||
| + | * Method to fasten the box to the stage | ||
| + | * Ease of access to clean or replace the honeycomb panel | ||
| + | * Protection of the exhaust blower from debris (screen) | ||
| + | * Material for the box (preferably light weight) | ||
| + | |||
| + | ===November 10, 2010=== | ||
| + | * Design process of honeycomb table started | ||
| + | * Gathering of information about possible construction materials | ||
| + | * Changes on honeycomb table dimensions | ||
| + | * Meeting and consulting machine shop technicians | ||
| + | * Concerns about using CNC machine ventilation system | ||
| + | * Adjustments on flexibility of securing materials while cutting | ||
| + | * Considerations regarding movement of thin materials: paper, card board, textile, etc. | ||
| + | |||
| + | ===November 16, 2010=== | ||
| + | * Presentation of ventilation box design | ||
| + | * Needs to work on dimensions to maximize laser's working area | ||
| + | * Research on prices for materials in MacMaster | ||
| + | * Design of possible tests for ventilation system | ||
| + | |||
| + | ===November 24, 2010=== | ||
| + | * Ventilation system approved | ||
| + | * Final adjustments to the honeycomb table | ||
| + | * Continue working on selecting building materials | ||
| + | * Start working on final report and final design files | ||
| + | |||
| + | ===November 30, 2010=== | ||
| + | * Order of materials submitted | ||
| + | * Waiting for materials to arrive: aluminum honeycomb sheet | ||
| + | * Final Report Submitted | ||
| + | * Considering building cardboard model | ||