This shows you the differences between two versions of the page.
| — |
labinfo:people:students2011:team_symbl:february_minutes [2012/03/12 12:19] (current) psmirnova created |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | **February 3, 2012** | ||
| + | * Learned about gears | ||
| + | * Having the right pressure angle & pitch diameter | ||
| + | * Deadline: mechanism drawings due Fri 2/10 | ||
| + | * Updated wiki | ||
| + | |||
| + | **February 8, 2012** | ||
| + | * Group Meeting to Solidify idea for music box | ||
| + | * We changed our idea from NYC Subway to Cooper Union tuition | ||
| + | * General Layout | ||
| + | * Due to the deficit, one building, Foundation or NAB must close | ||
| + | * Art and Engineering student duel to determine which school closes | ||
| + | * Engineering student wins, so Foundation Building falls | ||
| + | * Engineering building falls shortly after since Cooper cannot exist without either | ||
| + | * Plan out drawings for music box | ||
| + | |||
| + | |||
| + | **February 9, 2012** | ||
| + | * Group Meeting to Review and finalize drawings | ||
| + | * Drawings will be uploaded | ||
| + | * Review movements of mechanisms | ||
| + | * Artist and engineer moving in circles close to each other | ||
| + | * Buildings will drop at appropriate times with different sized (Pacman?) gears | ||
| + | * Bloody head hinging over with string attached | ||
| + | * Changing signs/background | ||
| + | |||
| + | **February 10, 2012** | ||
| + | * Met again to review & rehash our "tuition troubles" concept | ||
| + | * New direction: our automata will be displayed as a plea for donations to Cooper Union | ||
| + | |||
| + | **February, 13, 2012** | ||
| + | * Group Meeting to revise and finalize idea | ||
| + | * New idea | ||
| + | * Finalized drawings and gear mechanisms (uploaded) | ||
| + | |||
| + | **February 22, 2012** | ||
| + | * Group meeting to discuss gear mechanism due 2/24 | ||
| + | * Prepared SolidWorks file of "Pacman" gear | ||
| + | |||
| + | **February 23, 2012** | ||
| + | * Group meeting to finalize "Pacman" gear mechanism | ||
| + | * Lasercut the pieces and assembled the mechanism (picture uploaded on the main page) | ||
| + | |||
| + | **February 29, 2012** | ||
| + | * Group meeting to conceptualize and finish "Hat-begging" mechanism | ||